01 / Object analysis
Is the object suitable for implementation?
We assess the site's potential and how the zone is actually used before we select the equipment.
We are checking the facility type, users, surface area, zone access, session sales method, and actual capacity. We are also verifying the preliminary delivery and service route.
It provides the floor plan, dimensions, information about users, operating hours, building communication, and the planned sales model.
A preliminary decision on whether the premises have potential, what limitations need to be verified, and whether we should proceed to the concept stage.
A ground floor is not a requirement. A higher floor is possible if the transport of equipment, elevator, load-bearing capacity, service access, and other logistics allow for it.